Posting a tender, choosing between the two bid modes, and what each figure on the form commits you to. Read this once before your first tender; most of it you will not need again.

If you are looking at the form now and want to know what to type in a particular box, Filling in the form goes through every field in order. This page is the reasoning behind those choices.

What you are committing

When you post, the budget and your stake move into escrow. They are not spent, since an award draws from the budget and the remainder comes back to you, but they are locked, and a tender nobody funded cannot be posted. That is what lets a supplier take your tender seriously enough to spend a deposit bidding on it.

You can cancel while no bid has been committed, and everything returns. Once someone has bid, the tender runs its course: they have put money at risk on the strength of it.

Nothing published can be edited either: scope, category, rubric and terms are fixed by a hash when the tender opens. That is what makes it worth a supplier's time to quote. A mistake spotted before the first bid is a cancel-and-repost; after it, the tender has to finish.

And closing a tender that found no winner is a transaction, not a deadline. Past the award deadline the tender reads as closed while the budget and your stake are still held by the contract. Someone has to close it to release them, and anyone may, since the money returns to the buyer regardless.

Sealed or open

Sealed is the default and the one the integrity claim rests on. No bidder sees another's price until the reveal window. Nobody can price against a rival, and the award can be re-checked against the sealed bids afterwards. Use it when the purchase is contestable, when you may have to show the award was fair, or when you simply do not want suppliers pricing off each other.

Open publishes every bid as it arrives. Suppliers undercut each other in the open, which is what you want when the item is a commodity and price decides. Two things to know: the audit page will record that this tender's prices were visible, because it cannot claim otherwise, and suppliers who can watch each other to cut a price can also watch each other to hold one, which a sealed round makes impossible.

One practical wrinkle: an open tender still carries a reveal window, and nothing uses it. Scoring waits for that deadline whichever mode you chose, so on an open tender the round sits decided and unscoreable until it passes. Shorten it when you post, which the form offers to do.

The figures

Budget. The most you will pay. The contract refuses an award above it, so this is a limit rather than a target. The unspent remainder returns to you at award.

Bid deposit. What each supplier stakes to bid. Too low and bidding is free, which invites unserious bids; too high and you narrow the field to suppliers who can afford the float. The winner's deposit rolls into their performance stake rather than being returned.

Your stake. Your own skin in the game, held until the engagement finishes. It is what makes the tender credible to a supplier who has been let down before.

A platform fee, if one is set, comes out of the supplier's side. It is deducted from each milestone as it is accepted, so you pay the price you agreed and the supplier receives less. That makes it their cost to price in rather than a surcharge on you, but it is also why the rate is published on the bid page and written into the tender's terms: a supplier who only discovers it after winning has been quoted a different deal from the one they bid. It is zero on this deployment, and nothing about it appears anywhere while that is true.

Retention. A percentage withheld from each milestone and released when the last is accepted. Standard practice, and the reason a supplier finishing the job matters more to them than finishing a milestone.

Milestones. Any split summing to 100. Equal thirds suits services. For bulk goods the trade convention is 30, 70: a deposit against production and the balance against shipping documents.

Delivery per milestone. How long the supplier has, from the moment each milestone opens. It is a window, not a date: the clock restarts each milestone. Set it at least as long as the slowest bid you would accept, because the contract now refuses an award to a bid quoting more days than the window allows, so a short window quietly makes your best bids unawardable.

Acceptance window. How long you have to inspect after delivery before payment releases automatically. Hours for a document. Days for anything physical. Letting it lapse pays the supplier, which is the point: they should not be held hostage by silence.

Scoring

You publish the weights for price, delivery and quality before bidding opens, and they are hashed with the rest of the tender. They cannot be adjusted after the prices arrive, which is the whole reason they are published first.

The evaluator scores against those weights and writes a memo explaining the result. It recommends; it cannot award. You award, and only to the supplier the recommendation named. If you disagree with the recommendation, the honest move is to close the tender without award rather than to award around it.

Nothing ties the weights to the category you chose. A price-dominant rubric on a consultancy tender is permitted and is probably wrong; the form will not stop you.

Weights say how much a criterion can swing, not how much it will

This surprises people, so it is worth the arithmetic. Every criterion is scored as a ratio against the best bid received: the cheapest price scores 100, and a bid at twice that price scores 50. The same for delivery.

So the influence a criterion actually has depends on how far apart the bids are on it, not on its weight alone. A real round:

Price Delivery Score
Supplier A 2.95 5 days 87.5
Supplier B 2.80 10 days 75.0

B is cheaper and still loses, on a rubric weighted 50 price / 30 delivery. B's price advantage is 5%, worth 2.5 points. A's delivery advantage is 2×, worth 15. Six times the effect, from the criterion carrying the lower weight.

Nothing is wrong there, because halving a lead time is a bigger operational difference than paying 5% more, and the rubric said delivery was worth 30. But if that is not the trade you meant, the fix is the rubric rather than the result: raise the price weight, or tighten the delivery window so slow bids are excluded rather than merely marked down. The window is a hard limit; the rubric is a soft one.

In practice prices cluster, because suppliers converge on the market rate, while delivery can differ by multiples. So delivery often decides a tender that price was supposed to.

What a track record is actually worth

The quality score is not a judgement of anyone. It is arithmetic on one number, the engagements this supplier has completed on this deployment, and it runs 50 + 10 per completed job, capped at 100. A supplier nobody has hired here starts at 50; five completed jobs reach the ceiling.

On the default 50 / 30 / 20 rubric that converts into a concrete pricing advantage. Holding delivery equal, a supplier with history can bid this much dearer than a newcomer and still tie:

Completed here Quality Can be dearer by
1 60 about 4%
2 70 about 8%
5 or more 100 about 20%

Twenty per cent is a firm thumb on the scale, and it is where the ramp stops, since the difference between five completed jobs and fifty is nothing at all. Whether that is the trade you want is a rubric question: lower the quality weight and experience counts for less.

Two things to know before you rely on it. It counts only what happened here, so a supplier with thirty years of trade and no tenders on this deployment scores 50, the same as someone who registered this morning, because nothing on-chain can see a reputation earned elsewhere. And on a fresh deployment every supplier sits at 50, which means quality contributes the same ten points to every bid and your rubric is effectively price and delivery until somebody finishes a job.

When two bids score exactly the same

It happens: identical price, identical delivery, neither supplier with any history here. The evaluator settles it with a cascade that is fixed in advance and readable from the memo: the higher score, then the cheaper bid, then the quicker one, then the lower wallet address.

The last step is arbitrary, and deliberately so. Somebody has to win, there is no usable source of randomness on-chain, and an arbitrary rule that is fixed can be checked by the supplier who lost; one decided in the moment cannot. It is not worth gaming either, since reaching that step means matching a rival's price and delivery exactly, which you cannot see in a sealed tender.

A high score does not mean awardable

The rubric scores every revealed bid, including ones the contract will refuse. A bid over budget still gets a number, with a red flag beside it. The flags and the contract's own checks are what stop a bad award; the score is not a permission.

You cannot award around the recommendation

Once the bids are revealed you have two choices, not three: award the supplier the evaluator named, or award nobody.

Awarding somebody else is not a policy we ask you to respect. The contract refuses it. The recommendation is anchored against that specific winner, so an award naming anyone else finds no recommendation and the transaction reverts. This is the same rule that stops us awarding around it, and it is why the tender can claim it was decided by criteria fixed before any bid arrived. A buyer free to override afterwards would make the published rubric decoration.

It is stricter than common practice and closer to procurement law than common practice is: in a classic tender a panel recommends and a decision-maker may decline, but deviating from the published criteria is exactly what gets an award overturned on challenge.

If you want a different winner, closing without award is the only route, and it is expensive in a way that is easy to miss. Deposits return and nobody is out of pocket, so the cost is not financial. The cost is that every price is now public. A re-run is no longer a sealed tender: each supplier knows precisely what the others bid last time, so the second round is a different game, usually a worse one for you, and the fairness claim that made the first round worth entering does not apply to it.

So the judgement belongs before bidding opens, because that is the only moment it is free. If the cheapest bid should win, weight price at 100 and delivery at 0 and the arithmetic will do what you meant. If lead time genuinely matters less than the rubric says, change the rubric while you still can. The outcome afterwards is not something you can change.

Requirements

Two kinds, and the difference is deliberate. Checkable requirements, such as a maximum delivery time or a minimum number of completed engagements, are screened automatically and appear as red flags. Stated requirements, such as a certification or an accreditation, are reported as needing a person, never as satisfied, because nothing on-chain can verify them. A screening tool that ticked them off because a supplier said so would be worse than one that admits it cannot tell.

Buying as a team

Most buying is not one person's job. A requisition comes from one place, approval from another, and above some figure a second signature is required, a delegation of authority that already exists in writing at most companies.

By default a tender is posted from one wallet, which means one private key carries your entire purchasing authority. That is fine for a sole trader and uncomfortable for anyone else: the person holding it can award unilaterally, and if they leave you have a problem with live tenders.

Team accounts are coming, and are not usable yet. The contracts already support them: every permission check asks which address is calling, never whether that address is a person, so a multisig satisfies them exactly as a single wallet does, and Safe is deployed on Arc. What is missing is on this end: the app connects browser wallets only, so there is currently no way to sign as a Safe rather than as one of its owners. Connecting an owner's wallet makes that person the buyer, which is the thing a team account exists to avoid.

This section describes where this is going, so you can plan around it. What it will buy you:

  • A threshold. Two signatures above a figure, one below it, however your own rules read.
  • Segregation of duties. The person who requests need not be the person who approves, which is ordinary practice and impossible with a single key.
  • Continuity. Someone leaves, you rotate the owners, and live tenders are unaffected.

Every buyer action would run through it, from awarding to accepting a milestone, confirming receipt and extending a delivery window, so an award genuinely requires whoever your threshold says it requires. Tenders posted from a team account are already labelled on the tender page with their threshold, because a supplier deciding whether to spend a day preparing a bid should know whether the counterparty has internal controls or is one person with a hot key.

We deliberately will not manage the account here. Adding and removing owners is the one screen where being wrong locks a company out of its own money, and Safe has spent years getting it right.

What is verified and what is not. Safe is deployed on Arc, and nothing in these contracts assumes a single-key wallet, both of which I checked. Connecting one is not built, and no tender has ever been run from a team account. Until both are true, post from an ordinary wallet.

There is a second kind of delegation worth knowing about: an address holding the awarder role can award without being the buyer, capped at a figure the policy sets. That is how an agent is allowed to act, and it is the same mechanism that would let a junior buyer award below a threshold.

How you find out a supplier is waiting

Nothing here emails you, and that is deliberate rather than unfinished. A tender identifies people by wallet address, and an address is not a contact method, and nothing can send to 0x0C01…. Collecting email addresses would mean accounts, passwords and a database of who is buying what, which is a larger thing to trust than the contracts are.

So notice is pulled, not pushed: connect your wallet and the board lists what is waiting on you, including any question a supplier has asked and nobody has answered. Questions close when bidding does, and you cannot answer after that, so the item disappears once acting on it is no longer possible.

The practical consequence: if you post a tender and never return until the award deadline, you will have missed every question asked in between. Look in once a day while bidding is open. The panel is at the top of the board and says nothing at all when there is nothing to do.

Money that comes back to you

You will see a balance under Your payouts, and it is not the escrowed budget of a live tender. that stays committed until milestones are accepted. A buyer is credited from five places:

  • Unused budget, the moment you award. Publish 3.00, award 2.80, and 0.20 returns immediately.
  • Your stake, when the engagement reaches final acceptance.
  • Forfeited deposits, from any bidder who sealed a bid and never revealed.
  • A cancelled or no-award tender. The whole escrow, once it is closed.
  • An abandoned engagement. What was never earned, plus capped damages.

It is credited, not sent. Every settlement path ends by crediting an address and leaving the owner to claim it, which is what stops a participant blocking a settlement by refusing to receive. One transaction collects it whenever suits you.

Two things that catch people: the figure is your wallet's total across every tender, so a balance shown on one tender's page may have come from another. And finishing bidding releases nothing: the budget leaves escrow milestone by milestone, or in one go if the tender is closed without an award.

When something goes wrong

The supplier is running late. You can extend the delivery window, but only before it closes. Afterwards nothing can reopen it, which would be reversing a forfeiture rather than preventing one.

How far you can push it is set by your acceptance window, not by you. The milestone's escrow job expires at the deadline plus a transit allowance plus two acceptance windows, and an extension has to leave a transit and one full inspection inside that, so the most it can ever add is exactly one acceptance window. Set acceptance to three days and you can extend by three days; set it to five minutes and five minutes is all the room there is. If you expect to need slack, that is the figure to raise when you post the tender.

Nothing was delivered

The window closing does not move any money. Somebody has to settle the milestone, which ends the engagement and divides the escrow. It takes a transaction either party can send, because the contract decides the split and neither side can influence it.

There is a wait first. The milestone's escrow job outlives the delivery deadline by the transit allowance plus two acceptance windows, and settlement is refused until then. So between the window closing and settlement becoming possible there is a period where nothing can happen: the supplier cannot deliver and nobody can settle. The Actions panel says which of the two you are in.

What you get back is not everything. You recover the unpaid price, the retention held from milestones already accepted, and this milestone's escrow. From the supplier's stake you recover damages, capped at what re-procuring would actually have cost you: the next-cheapest revealed bid, less what you awarded. Whatever they staked above that returns to them. A security covers a loss; it is not confiscated because one occurred.

One case takes the whole stake, and it follows from your own award. The cap only exists because there is a runner-up to measure against. If you awarded a bid that was not the cheapest revealed, there is no such measure, so excessCost is zero and nothing bounds the damages, so the entire stake goes to you. That is worth knowing before you award: choosing a dearer bid buys you a stronger remedy if it fails.

The panel shows both figures, to the cent, before anyone presses the button.

The work is wrong. Reject the milestone with a reason. The reason is recorded, the money stays locked, and the supplier may dispute it. A rejection nobody can read is indistinguishable from no reason at all.